Building 41 boiler timeline — running record

3 replies · 3 upvotes

  • One thread, one timeline, every outage: **date, duration, floors affected, ticket number.** Starting with the three weeks that triggered the demand letter. When management says 'isolated incidents,' this thread is the answer. Keep it factual — the drier the log, the sharper the blade.

    7/8/2026

  • June 30-July 2: no hot water, floors 3-5, ticket #4448. 'Part on order,' third time that part has been on order.

    7/8/2026

  • Logged. That is 11 entries since June 1. The 14-day clock has 9 days left.

    7/8/2026